PROFILE AMIN TARIQ

 
 
Name: M. AMIN TARIQ
 Education
 
  • B.Sc, Civil Engineering, University of Engineering & Technology Lahore, 1987

  • M.Sc. (Structures and Foundation Engg.) 1991

  • MIE (Pak,) P.E

 Other Training
 

During his M.Sc. post graduate studies he completed following fields of specialization as advanced courses;

  • Advanced reinforced concrete design.

  • Properties of concrete.

  • Pre-stressed concrete design.

  • Plastic design of steel structures.

  • Advanced foundation design.

  • Dam design and construction.

 Membership in Professional Institutions
 
  • Pakistan Engineering Council
  • CDA as Design and Review Engineer
  • All most all Building Regulatory Agencies in Pakistan.
 Academic Activities
 

He is a guest speaker to National College of Arts, Lahore and external examiner for Masters and Graduate courses to University of Engineering and Technology Lahore.

 Professional Career
 

From 1996 To Present Employer M/s Amin Tariq Associates position held and Chief Executive/Consulting Engineer Description Of Duties Providing consulting services to several firms in architectural structural and service design, preparation of detailed construction drawings, bidding documents, specifications, site supervision, and in geo-technical engineering.

 

      1. LIST OF PROJECTS (IN HAND)

  • Malakand 3, Hydro Power Project, Malakand.

  • Structural Engineering and Stability Analysis of Power House Tunnels for delivery and discharge under hydraulic heads/pressure , spillways, spilling basins, building and other related structures of 81 MW hydal power plant.

  • Restoration of Lahore Fort, Sheeh Mehal and Royal Kitchens and Shalamaar Gardens Mughal Chambers. Structural Design & Execution Supervision of restoration of Lahore Fort (specially Sheesh Mahal Roof) as National Expert in collaboration with UNESCO.

  • 125MW KAMC Power Plant, Tabuk, Saudi Arabia

  • Engineering Design including Civil, Structural, Electrical & Mechanical of Extension of Gas Turbine Power Plant.

  • Big City Plaza, Liberty Market, Gulberg, Lahore - 500,000 sft. Services including complete design and construction supervision management

  • Rahat Shopping Mall, Rawalpindi - 550,000 sft. Structural, Electrical and Public health Engineering Design of Multistory plaza

  • Karakoram Enclaves Phase 1&2, F-11, Islamabad - 520,000sft. Structural, Electrical and Public health Engineering Design of Multistory residential building

  • Savoy Center, F 11, Islamabad - 300,000 sft. Structural, Electrical and Public health Engineering Design of Multistory residential building.

  • Bahria Club Rawalpindi - 50000 sft. Structural and Service Design of Multistory building.

  • CSK Distlleries, Phalia. Structural Design of extension in Distillery Plant

  • United Sugar Distillery, Sadiqabad. Architectural, Structural and Service Design of Ethanol Plant. 

  • Kohat Cement White Line Project, Kohat. Complete Structural Engineering, Service and Architecture of new white cement plant and extension in existing grey cement plant

  • Master Tiles Monomaster Plant, G.T. Road, Gujranwala. Structural and Service Design of PEB industry for new plant by Master Group of industries

  • CDL Foods, Bhai Pheru. Complete Architectural, Electrical & Engineering Design/Construction supervision management of new warehouse, extension of tetra pack storage hall and roads network

  • Abbas Corporation, Raiwind Road, Lahore. Scope of services includes Architectural, Engineering Design, Services Design, Interior and Construction Management Supervision. Carpet Finishing Facility.

  • Prix Pharmaceutical Lahore. Structural, Electrical and Public Health Engineering Design of Prix Pharmaceutical Plant

  • Plastobag industry, Hattar. Structural Engineering Design of Prix Pharmaceutical Plant.

      2. LIST OF PROJECTS COMPLETED  BY AMIN TARIQ ASSOCIATES

  • 1997 - 2002 Siddique Trade Centre Main Boulevard, Gulberg Lahore - 750,00 sft Engineering Design and Review of the tallest and largest structure in Lahore. Cost Rs.500 million 

  • 1999 - 2000 Office Block for Habib Rafiq (Pvt.) Ltd. - 7956 sft Architectural, structural, public health, electrical design and supervision. Cost Rs.4.8 million 

  • 1999 - 2000 Pak-Arab Refinery Steel Building package at Mahmood Kot in Collaboration with Marubeni Corporation-Japan and Habib Rafiq (Pvt.) Ltd. Pakistan - 20,000 sft. Architectural, structural, civil, public health, HVAC design and supervision. Cost Rs.30 million

  • 1999 Lahore American School-Extension, Lahore - 30,000 sft Engineering Consultancy including Design and Supervision of ClassRoom Block and Theatre Block. Cost Rs.30 million.

  • 1999 Eden Suburb Town Houses Scheme at Thokar Niaz Baig, Lahore - 615,000 sft Town Houses. Cost Rs.27.6 million.

  • 1999 Leather Factory at Ferozepur Road, Lahore - 15,190 sft Architectural, Structural, Services and Civil design and supervision. Cost Rs.9.6 million.

  • 1998 - 1999 Fort Villas Town Houses Scheme at Defence Lahore. 66 Town Houses, Architectural, Structural and Public Health Design. Cost Rs.74 million.

  • 1998 - 1999 Hamza Foundation Academy at Johar Town, Lahore - 180,000 sft Architectural / Structural and Plumbing Systems Design. Cost Rs.110 million.

  • 1997 - 1999 Aruj Textile Mills-Extension, Manga Raiwind Road-12,000 sft Garment Accessories unit Cost Rs.04 million.

  • 1996 - 1999 Leeds Centre, Main Boulevard Gulberg, Lahore - 150,000 sft 7 Storied Plaza at Main Boulevard, Gulberg, Lahore. Cost Rs.75 million.

  • 1997 - 1998 Low Cost Sanitation Project at Sitara Colony Ferozepur Road, Lahore. Sewerage system designed after detailed land survey. Cost Rs.80 million.

  • 1996 - 1998 AES Lalpir Power Project At Lalpir. Workshop, Pre-cast Bridge, Plane Parking Shed, Badminton Court. Cost of Project was Rs.600 million.

  • 1996 - 1997 Global Heights Lawrence Road, Lahore - 350,000 sft 12 Stories Twin Plaza. Cost Rs.200 million.

  • 1996 - 1997 Hira Complex Liberty Market Gulberg, Lahore - 100,000 sft Complete design of 8 Storied commercial building at Liberty Market, Lahore. Cost Rs.60 million. Cost Rs.60 million.

  • 1996 PTV RBS Self Supporting Tower at Dir. 230 Ft. High steel structure. Cost Rs.5.00 million.

  • 1996 Regency Plaza Mini Market Gulberg, Lahore - 50,000 sft 12 Storied Plaza. Cost Rs.30 million.

      3. INFRA STRUCTURE & HOUSING SCHEMES

Green Fort - 2 Housing Scheme at Thokar Niaz Baig Lahore

Fort Villas Town Houses Scheme (66 Town Houses) at Defence Lahore.

Eden Avenue Town Houses Scheme (285 Town Houses) at Defence Lahore.

Eden Suburb Town Houses Scheme at Thokar Niaz Baig  Lahore.

Eden Park Farm Housing Scheme near Lahore Park, Raiwind Road Lahore.

Sehgal State at Canal Bank Lahore.

 From 1987 To 1996 Employer M/S Progressive Consultants (Pvt) Ltd.
 

Description of Duties Worked with M/s Progressive Consultants (Pvt.) Ltd. as a consulting structural engineer. Supervised/designed the following main projects.

 

  • Sheraton Hotel and Towers Lahore.

  • Shaukat Khanum Memorial Hospital Lahore.

  • Pediatric Hospital and Institute Lahore.

  • Lahore University of Management Sciences.

  • Kot Addu Power Station Units 13,14,15.

  • Milk Powder Plant-A multistory Industrial Building at Sheikhupura-Lahore Road.

  • Ravi Chemicals Extension.

  • FJFC Fertilizer Complex at Bin Qasim Karachi.

  • Bestway Cement Plant 3300 tpd Capacity.

  • Rupafab Dyeing and Finishing, Rawind Road, Lahore.

  • Rupafil Polymer Plant, Faisalabad Road, Sheikhupura.

      As a Consulting Structural Engineer designed the following projects.

  • Sheikh spinning Mills at Raiwind Manga Road.

  • Adil Textile Mills at Sheikhupura.

  • Musrat Textile Mills at Satiana Faisalabad.

  • Khalid Nazir Spinning Mills at Gujranwala.

  • Bluestar Spinning Mills at Raiwind Manga Road.

  • Land Mark Spinning Mills at Windher Baluchistan.

  • Pak Panther Spinning Mills at Raiwind Manga Road.

  • Duabi Spinning and Weaving Mills at Duabi.

  • Ishaq Textile Mills at Shahkot Faisalabad.

  • Shahid Textile Mills at Shahkot Faisalabad.

  • Superspun Cotton Textile Mills at Multan.

  • Cresent Knitwear Ltd at Ferozepur Road Lahore.

  • French School Building Islamabad.

  • Softknit Textile Raiwind Road.

  • Aruj Textile Mills.

  • Reliance Knitting Raiwind Manga Road.

  • Shalimar Resin Industries, Ferozpur Road, Lahore.

  • Pakmalamin Chemicals,Kamonki.

 List of Projects Designed As Consulting Engineer While Working With Other Companies
 
  • 1997 - 1998 Trade Tower Main Boulevard Gulberg, Lahore - 100,000 sft, 7 Storied structure design owned by Foreign Bank. Cost Rs.50 million

  • 1997 - 1998 US Apparel Extension Defence Road, Lahore- 25,000 sft Complete design of office block and extension work. Cost Rs.20 million

  • 1996 - 1997 Shalimar Resin Industries, Ferozepur Road, Lahore - 100,000 sft A hi-tech multistoried paint industry. Cost Rs.10 million

  • 1995 - 1998 FJFC Fertilizer Complex at Bin Qasim Karachi. Designed DAP, UREA, CO2Compressors at 14000 rpm and attended coordination meetings in France and Germany. Cost Rs.650 million.

  • 1995 - 1998 Bestway Cement Plan - 3300 tpd capacity Designed Silos, Kiln and attended coordination meetings in Japan. Cost Rs.800 million.

  • 1995 - 1997 Kot Addu Power Station Units 13,14,15 - 400 MW Capacity. A combined cycle power plant with gas turbines, steam turbine, exhaust stacks cooling tower etc. Cost Rs.700 million.

  • 1995 - 1996 Rupafil Polymer Plant, Faisalabad Road, Sheikhupura - 25,000 sft A chemical plant with machinery and multi level. Cost Rs.150 million.

  • 1994 - 1996 Bluestar Spinning Mills at Bahawalpur - 30,000 sft, A spinning unit with most modern machinery. Cost Rs.13.5 million.

  • 1994 - 1996 Rupafab Dyeing and Finishing, Raiwind Road Lahore - 120,000 sft, A textile unit with all facility shell roof structural system. Cost Rs.60 million.

  • 1994 - 1995 Dubai Spinning and Weaving Mills, Dubai - 25,000 sft, Structural and Architectural Design. Cost Rs.20 million.

  • 1994 - 1995 Musarat Textile Mills at Satina Road, Faisalabad, Textile unit and allied colony, administration office and services design. Cost Rs.20 million

  • 1994 - 1995 Tripack Films plant at Hattar, Coordination planning and civil design of complete plant. Cost Rs.63 million.

  • 1993 - 1996 AIPL's BCS Plant Rawat, Civil/Structural Design of  Basic Chromium Sulphate Plant and allied Building. Cost Rs.80 million.

  • 1992 - 1995 Lahore University of Management Sciences, Lahore. Design of main Academic Block, Class Rooms and Theatre Building. Cost Rs.300 million. 

  • 1992 - 1993 Land Mark Spinning Mills at Windher Baluchistan - 20,000 sft, Textile unit and allied colony, administration office and services design. Cost Rs.10 million.

  • 1991 - 1992 French School Building, Islamabad - 15,000 sft, A multistoried building at Blue Area, Islamabad. Cost Rs.9.1 million.

  • 1990 - 1991 Milk Powder Plant-A  at Lahore Sheikhupura Road. Structural and civil design of plant, plant foundation and adjoining buildings. Cost Rs.670 million.

 